Legrenzi sheds

Hot galvanized metal structure suitable for the formation of canopies

Client

Contractor: LEGRENZI S.r.l.

Final costumer: LEGRENZI S.r.l.

Installation site: Clusone (BG) - Italy

Weight of structure: 30 ton

Completion time: 15 days

BREMBO ROLLER BENCH

Metallic carpentry structure designed for the construction of a new roller bench integrating a vehicle entryway

Client

Contractor: Cospe S.r.l.

Final costumer: Brembo S.p.A.

Installation site: KM Rosso - Stezzano (BG) - Italy

Weight of structure: 50 ton

Completion time: 60 days

TOP TOWER

Zinc plated steel structure designed for the erection of an amusement park attraction tower

Client

Contractor: Parco Avventura Bergamo S.r.l.

Final costumer: Parco Avventura Bergamo S.r.l.

Installation site: Torre Boldone (BG) - Italy

Weight of structure: 45 ton

Completion time: 45 days

IR STANDARD ELEMENTS

Metal carpentry works engineered for the formation of underframe, oil vat and various support-mount structures

Client

Contractor: Ingersoll Rand

Final costumer: -

Installation site: -

Weight of structure: -

Completion time: -

SKID FRAMES for the Coral South Development project

Raw steel carpentry works in 355J2 steel grade for the construction of skid frames (“Coral South Development” project)

Client

Contractor: Unidro S.p.A.

Final costumer: ENI

Installation site: Mozambique

Weight of structure: 50 ton

Completion time: 70 days

SINPRO LATTICE BEAM STRUCTURE

Raw steel carpentry works in S355NL steel plate for the formation of a lattice beam structure

Client

Contractor: Sinpro S.r.l.

Final costumer: Tatneft Refinery

Installation site: Nizhnekamsk (Russia)

Weight of structure: 45 ton

Completion time: 40 days

INTERMEDIATE ROOF-SPACE STRUCTURE in ALBINO (BG) Italy

Zinc plated steel structure designed for the construction of a new, internal roof-space floor

Client

Contractor: G.F.M. S.p.A.

Final costumer: G.F.M. S.p.A.

Installation site: Albino (BG) - Italy

Weight of structure: 15 ton

Completion time: 15 days

GUALINI FAÇADE ELEMENTS

Metallic carpentry structure designed for the construction of glass window and/or door frame support elements, with surface sandblasting and RAL grey base coat treatments

Client

Contractor: Gualini S.p.A.

Final costumer: -

Installation site: Milan - Italy

Weight of structure: 15 ton

Completion time: 30 days

OEHRI INDUSTRIAL SHED

Zinc plated steel structure designed for the construction of a new, tool storage facility industrial shed

Client

Contractor: Oehri Georg

Final costumer: Oehri Georg

Installation site: Gamprin (Liechtenstein)

Weight of structure: 50 ton

Completion time: 30 days

Serioplast intermediate roof-space floor

Construction of an intermediate roof-space floor, including wall cladding, sheet metal works, integrative cast-in and waterproof covering.

Client

Contractor: Serioplast S.p.A.

Final costumer: Serioplast S.p.A.

Installation site: Nova Milanese (MI)

Weight of structure: 17 ton

Completion time:

the Ingersoll Rand underframes

Five baseplates for a centrifugal air compressor built according to American Petroleum Institute standards and delivered to a refinery in Middle East.

Client

Contractor: Ingersoll Rand

Final costumer:

Installation site:

Weight of structure: 120 ton

Completion time: 90 days

warehouse facilities partitioning walls

Metallic carpentry partition wall structure, constructed to close off an automated warehouse system.

Client

Contractor: F.P.R. S.r.L.

Final costumer: Trafilerie Carlo Gnutti S.p.A.

Installation site: Chiari (BS)

Weight of structure: 90 ton

Completion time: 35 days

Tenacta Group central heating plant

New central heating plant facilities for an existing industrial shed.

Client

Contractor: Tenacta Group S.p.A.

Final costumer: Imetec

Installation site: Azzano San Paolo (BG)

Weight of structure: 5 ton

Completion time: 15 days

External Fire Escape and safety stairway

Construction of an outside fire escape and safety stairway in zinc plated steel.

Client

Contractor: Kennew S.r.L.

Final costumer: Techbau

Installation site: Cassano Magnago (VA)

Weight of structure: 10 ton

Completion time: 14 days

Belvedere over the town square

Belvedere looking over the town square

Client

Contractor: Impresa Geom. Locatelli

Final costumer: The Peia Municipality

Installation site: Peia (BG) - Italy

Weight of structure: 9.5 ton

Completion time: 16 days

The Büchel AG industrial shed

Turnkey installation of the industrial shed including the external company name boards, the intermediate floors inside the shed and the external, sliding gatesdays

Client

Contractor: Wilhelm Büchel AG

Final costumer: Wilhelm Büchel

Installation site: Liechtenstein

Weight of structure: 350 ton

Completion time: 60 days

The Flamma SPA pipe rack and safety staircases

Construction of a 40m pipe rack, two safety staircases, two roofing structures and the industrial shed’s entrance gate

Client

Contractor: Flamma S.p.A.

Final costumer: Flamma S.p.A.

Installation site: Chignolo d’isola (BG) - Italy

Weight of structure: 40 ton

Completion time: 30 days

The Capaul building

Construction of the three-level shell shaped company building

Client

Contractor: Nägele-Capaul AG

Final costumer: Alexander Capaul

Installation site: Flims - Switzerland

Weight of structure: 100 ton

Completion time: 30 days

Pipe And Cable Rack

Pipe and cable rack for the new rolling mill

Client

Contractor: Ferretti International

Final costumer: Libian Iron and steel company

Installation site: Misurata - Libya

Weight of structure: 1600 ton

Completion time: 210 days

Enagas Underframe

Underframe for the alternative compressors serving the gas pumping station motors

Client

Contractor: Pieffedieci tecnologie industriali

Final costumer: Enagas

Installation site: Yela - Spain

Weight of structure: 75 ton

Completion time: 90 days

Autoservizi Locatelli

Construction of a new cantilever roofing truss for the road service vehicle facilities, for a total 5000 m2 covered surface

Client

Contractor: Autoservizi Locatelli S.r.L.

Final costumer: Autoservizi Locatelli S.r.L.

Installation site: Brembate Sopra (BG) - Italy

Weight of structure: 600 ton

Completion time: 120 days

The RCS – Corriere della Sera building

Structural construction and steel roofing for the “Corriere della Sera” national daily newspaper’s new printing facilities

Client

Contractor: Impresa Pandini S.p.A.

Final costumer: RCS Corriere della Sera

Installation site: Pessano con Bornago (MI) - Italy

Weight of structure: 420 ton

Completion time: 90 days

The Geogreen steel works

Construction of the metal carpentry structure for the plant pipe racks, construction of the storage tank support structures and of the 8000 m2 surface plane bearing structure for the plant’s main production works

Client

Contractor: Noyvallesina Engineering S.p.A.

Final costumer: Geogreen S.p.A.

Installation site: S. Giorgio di Nogaro (UD) - Italy

Weight of structure: 1.480 ton

Completion time: 240 days

The Dalmine waste-to-energy plant

Construction of both the furnace and the trestle tower structures

Client

Contractor: Noy Vallesina Engineering S.p.A.

Final costumer: REA S.p.A.

Installation site: Dalmine (BG) - Italy

Weight of structure: 980 ton

Completion time: 280 days

The Hewlett Packard building

Construction of a new office building, utilities and inside and outside staircases

Client

Contractor: Impresa Salvi S.p.A.

Final costumer: Hewlett Packard

Installation site: Stezzano (BG) - Italy

Weight of structure: 320 ton

Completion time: 110 days

The Sinpro Underframes

Motor support under-frame units

Client

Contractor: Sinpro S.r.L.

Final costumer: Burckhardt Compression

Installation site: Scotland

Weight of structure: 20 ton

Completion time: 45 days

The Domus Bergamo Lab

A temporary restaurant-laboratory hall constructed in connection with the Expo2015 exhibition, composed of modular crystal, wood and steel structures enclosing an overall atmosphere of  transparency, resistance, energetic efficiency and durability performance over time

Client

Contractor: Alta Qualità S.r.L.

Final costumer: The Bergamo Municipality

Installation site: Piazza Dante in downtown Bergamo (BG) - Italy

Weight of structure: 15 ton

Completion time: 25 days

Certifications

Over the years Carpenteria F.lli Bonacorsi has obtained a number of certifications aimed at increasing the overall process quality standards, in total compliance with the following specific standards set forth by the laws currently in force:

    • UNI EN ISO 9001:2015 (quality management system)
 
    • UNI EN 1090-1:2012 execution class EXC3 (execution of steel and aluminium structures)
 
    • UNI EN ISO 3834-2:2006 (quality requirements for the fusion welding of metallic materials)
 
    • ASME BOILER & PRESSURE VESSEL CODE:2017 (section IX)
 
    • AWS D1.1 - D.1.1M:2015
 
    • CERTIFIED STEEL TRANSFORMATION OPERATIONS

Organization chart

Contacts